2022 Ford Transit Custom
2.0 300 Ecoblue Limited L2 H1 Euro 6 Ss
21,186mi Auto Diesel 2.0L
£22,000
Hinckley
from £462/pm
A 2.0l diesel engine and automatic transmission are just a couple of the aspects that this mpv Ford is offering.
Images of a similar car, for illustrative purposes only.
350 Rwd 2.0 Ebl 130 L3 Long Leader Drw Luton Tai
28,000mi Manual Diesel 2.0L Not for sale on carsnitch
Current value range
7,987 cars
Rates from 9.9% APR. A Representative HP Example: borrowing £10,000 over 60 Months with a representative of 16.35% APR, an annual interest rate of 16.35% (fixed) and a deposit of £0.00, the amount payable would be 59 repayments of £239.16 per month, with one final repayment of £249.16 (which includes the option to purchase fee of £10.00), with a total cost of credit of £4,349.41 and a total amount payable of £14,359.41.
2.0 300 Ecoblue Limited L2 H1 Euro 6 Ss
21,186mi Auto Diesel 2.0L
£22,000
Hinckley
from £462/pm
A 2.0l diesel engine and automatic transmission are just a couple of the aspects that this mpv Ford is offering.
Rates from 9.9% APR. A Representative HP Example: borrowing £10,000 over 60 Months with a representative of 16.35% APR, an annual interest rate of 16.35% (fixed) and a deposit of £0.00, the amount payable would be 59 repayments of £239.16 per month, with one final repayment of £249.16 (which includes the option to purchase fee of £10.00), with a total cost of credit of £4,349.41 and a total amount payable of £14,359.41.
320 Trail Ecoblue
24,435mi Manual Diesel 2.0L
£24,990
Worcester
from £525/pm
This second-hand Ford from this dealer incorporates a 2.0 L diesel motor with manual transmission and has 24,435 miles clocked-up on the dash.
2.0 Tdci 290 Trend L2 H1
114,000mi Manual Diesel 2.0L
£7,595
Dumbarton
from £159/pm
114,000 miles clocked up on the dash and coming finished in the shade of blue, this motor comes fitted with manual transmission and has got a 2.0 ltr diesel motor.
2.0 290 Ecoblue Sport L2 H1 Euro 6 Ss
45,648mi Manual Diesel 2.0L
£19,900
Hinckley
from £418/pm
Have a closer look at this Transit Custom that is rated as one of the most trustworthy and dependable vehicles available. It features a 2.0L diesel motor and manual transmission. This second hand model currently in stock at our dealership in Hinckley has 45,648 miles on the dash and has been finished in the shade of black.
2.0 Tdci 290 Trend L2 H1
114,324mi Manual Diesel 2.0L
£7,995
Dumbarton
from £168/pm
This dealer is advertising an outstanding price on this Ford Transit Custom 2.0 Tdci 290 Trend L2 H1 that's been created to have dependability and trustworthiness in mind. This particular model is built with a 2.0 ltr diesel engine and has 114,324 mi clocked-up on the dashboard.
Limited
17,853mi Manual Diesel 2.0L
£21,895
Gloucester
from £460/pm
This mpv is known as one of the most reliable cars available. This second hand model, available from this dealer contains a 2.0 Ltr diesel engine with manual transmission and has 17,853 miles clocked-up on the dash.
Panel Van 2.0 300 Ecoblue Limited L1 H1 Euro 6 S
82,241mi Auto Diesel 2.0L
£16,495
Brentwood
from £346/pm
Become the next owner of this mpv which incorporates a 2.0 L diesel motor with automatic transmission. This used one now available from this dealer has been finished in white and has got 82,241 mi clocked-up on the dash.
2.0 300 Ecoblue Limited L1 H1 Euro 6 Ss
36,646mi Manual Diesel 2.0L
£16,500
Hinckley
from £346/pm
This mpv used car has 36,646 miles clocked up on the dash and contains a 2.0 ltr diesel engine. It's currently available to buy for the terrific price of only £16,500.
350 Ecoblue Leader 155Ps Cherry Picker L2 H2 Fwd W
25,529mi Manual Diesel 2.0L
£42,990
David Spear Commercial Vehicles
from £902/pm
Ford Transit Custom with a 2000cc diesel engine and manual gearbox.
Minibus 2.2 Tdci Hdt Trend 17 Sts Air Con Front An
103,624mi Manual Diesel 2.2L
£8,990
Birmingham
from £189/pm
In a finish, this second hand car has a 2.2 litre diesel motor with manual transmission and it has 103,624 miles on the clock.
300 Ecoblue Limited 130Ps L2 Lwb Dscv Exclusive Wi
22,200mi Manual Diesel 2.0L
£20,990
David Spear Commercial Vehicles
from £441/pm
Currently available at our dealership is this mpv Ford Transit Custom 300 Ecoblue Limited 130Ps L2 Lwb Dscv Exclusive Wi that incorporates a diesel, 2000 cc engine and manual gearbox. It is on offer and ready for you to take home in a shade of black with 22,200 miles clocked up on the dash. It is a great choice if you're looking for a vehicle that has an outstanding track record for trustworthiness and reliability.
2.0 Ecoblue 130Ps H2 Leader Van
36,306mi Manual Diesel 2.0L
£17,498
Warrington
from £367/pm
Up for sale and ready for its next owner to take home is this Ford Transit Custom, it contains a 2000 CC diesel motor with manual transmission. This used model from us at this dealer is up for sale at the low price of only £17,498.
2.0 Ecoblue 170Ps Low Roof Dcab Limited Van
13,271mi Auto Diesel 2.0L
£29,995
Winsford
from £630/pm
Ford's Transit Custom is in the top 20 of the UK's reliability index and this dealer currently has this second hand model in stock for only £29,995. It's already a great price for this particular model and even more so if you take into account that it is less likely to let you down and cost you extra money in repairs.
2017 350 L2 H3
107,823mi Manual Diesel 2.0L
£9,999
Coventry
from £210/pm
Containing a 2.0 ltr diesel motor and a manual gearbox, this trustworthy Ford is available for sale in blue with 107,823 miles clocked-up on the dash. This second hand vehicle is advertised at £9,999 with achievable repayment packages at hand beginning from only £ per calendar month.
2024 2.0 Ecoblue 136 Bhp 300 L2 H1 Limited
47,000mi Manual Diesel 2.0L
£19,995
Sheffield
from £420/pm
This reliable Ford Transit Custom incorporates a 2.0 Litre diesel motor with manual transmission and has got 47,000 miles clocked up on the dashboard. Grab the opportunity today to be the proud buyer of this second hand model that is for sale at the price of £19,995.
Panel Van 2.0 300 Ecoblue Limited L1 H1 Euro
80,109mi Auto Diesel 2.0L
£15,995
Brentwood
from £336/pm
Be the next owner of this Transit Custom that contains a 2000 CC diesel motor and automatic transmission. This second hand model at this dealer has been finished in silver and has got 80,109 miles on the dashboard.
2L Limited
6,500mi Auto Diesel 2.0L
£44,995
Stalybridge
from £944/pm
Advertised by this dealership in Stalybridge is this Ford Transit Custom 2L Limited encompassing a diesel, 2000 CC engine and automatic gearbox. Up for sale and ready for you to take home in a black finish with 6,500 miles on the clock.
2.0 320 Ecoblue Ms-rt Crew Van L1 H1 Euro 6
812mi Auto Diesel 2.0L
£51,000
Hinckley
from £1,071/pm
The Ford Transit Custom is in the top 20 of the reliability index. You can get this second hand model from this dealer with automatic transmission, a 2.0 litre diesel motor and 812 miles clocked-up on the dashboard. Despite being second hand, it's still in an almost spotless, like new condition in and out.
2.0 320 Ecoblue Limited Crew Van L2 H1 Euro 6
99,890mi Manual Diesel 2.0L
£12,595
Dumbarton
from £264/pm
Make sure you consider this mpv that's rated as one of the United Kingdom's top 20, most trustworthy and dependable vehicles. This used model available in the shade of white, has 99,890 miles on the dashboard and contains a 2.0 Ltr diesel motor with manual transmission.
Trend
10mi Auto Diesel 2.0L
£35,000
Birmingham
from £735/pm
A remarkable price of £35,000 is currently being advertised by this dealer in Birmingham for this reliable and trustworthy Transit Custom that is in a near pristine, nearly new condition throughout. This model is equipped with a 2000CC diesel engine, automatic transmission and has 10 miles clocked-up on the dashboard.
2.0 300 Ecoblue Limited L1 H1 Euro 6 Ss
76,000mi Manual Diesel 2.0L
£13,495
Ripley
from £283/pm
Get this second-hand Ford Transit Custom for only £13,495. Finance plans commence from £ monthly for this vehicle which contains a 2.0 Ltr diesel motor with manual transmission.
2.5L Limited
8,700mi Auto Hybrid 2.5L
£41,995
Stalybridge
from £882/pm
Respected for its dependability and trustworthiness, this Ford Transit Custom 2.5L Limited is equipped with a 2.5l hybrid engine and it has automatic transmission.
2.0 L 2.0 Tdci 290 Trend Colour Edition L1 H1
58,000mi Manual Diesel 2.0L
£12,990
Hemel Hempstead
from £273/pm
Renowned for its trustworthiness and reliability, this mpv Ford incorporates a 2000 cc diesel motor and it's got manual transmission.
Limited
10mi Auto Hybrid 2.5L
£32,995
Birmingham
from £693/pm
Have a look at this that features a 2.5 LTR hybrid motor with automatic transmission. This used model in Birmingham is for sale at the fantastic price of just £32,995, comes finished in grey and has 10 miles clocked up on the dashboard.