2024 Ford Transit Custom
2.0 Ecoblue 136Ps H1 Van Limited
8,387mi Manual Diesel 2.0L
£23,498
Chesterfield
from £493/pm
With 8,387 miles on the dashboard, this Ford is equipped with a 2.0l diesel engine and manual transmission.
Images of a similar car, for illustrative purposes only.
350 2.0 Ebl 170 Bhp L3 Long Leader Edition
15,000mi Manual Diesel 2.0L Not for sale on carsnitch
Current value range
7,940 cars
Rates from 9.9% APR. A Representative HP Example: borrowing £10,000 over 60 Months with a representative of 16.35% APR, an annual interest rate of 16.35% (fixed) and a deposit of £0.00, the amount payable would be 59 repayments of £239.16 per month, with one final repayment of £249.16 (which includes the option to purchase fee of £10.00), with a total cost of credit of £4,349.41 and a total amount payable of £14,359.41.
2.0 Ecoblue 136Ps H1 Van Limited
8,387mi Manual Diesel 2.0L
£23,498
Chesterfield
from £493/pm
With 8,387 miles on the dashboard, this Ford is equipped with a 2.0l diesel engine and manual transmission.
Rates from 9.9% APR. A Representative HP Example: borrowing £10,000 over 60 Months with a representative of 16.35% APR, an annual interest rate of 16.35% (fixed) and a deposit of £0.00, the amount payable would be 59 repayments of £239.16 per month, with one final repayment of £249.16 (which includes the option to purchase fee of £10.00), with a total cost of credit of £4,349.41 and a total amount payable of £14,359.41.
2.0 Ecoblue 130Ps Leader Luton Van
99mi Manual Diesel 2.0L
£35,450
Harlow
from £744/pm
Favoured for its reliability and trustworthiness, this mpv motor incorporates a 2000CC diesel motor and has manual transmission.
2L Limited
11,625mi Manual Diesel 2.0L
£18,985
Nottingham
from £399/pm
A fabulous price of just £18,985 is being advertised by our dealership for this low mileage mpv that contains a 2.0 L diesel motor with manual transmission.
2.0 Ecoblue 110Ps H1 Van Trend
17,003mi Manual Diesel 2.0L
£22,498
Wolverhampton
from £472/pm
Considering going for a model that has been designed to be durable and trustworthy and is amongst those rated in the top twenty of the UK's reliability index? Well, have a more detailed look at this low mileage Ford from this dealer with manual transmission, a 2.0 litre diesel motor and a mere 17,003 miles on the clock.
350 Leader 2.0 Ecoblue 130Ps
99mi Manual Diesel 2.0L
£35,450
Harlow
from £744/pm
A low price of only £35,450 is being advertised by this dealership on this Ford that is known as one of the most trustworthy and durable models around.
2.0 Transit Custom
69,500mi Manual Diesel 2.0L
£21,995
Carlisle
from £462/pm
At this car dealership there is a marvellous price on this used Ford Transit Custom 2.0 Transit Custom with manual transmission, a 2.0 l diesel engine and 69,500 miles clocked up on the dashboard.
1.2 Acenta
165mi Auto Electric 1.2L
£24,995
Ipswich
from £525/pm
This Transit Custom 1.2 Acenta has 165 miles clocked up on the dash and comes fitted with a 1.2 litre engine. It runs on electric with automatic transmission and has been finished in the shade of white.
2L Limited
24,333mi Manual Diesel 2.0L
£23,830
Appleby-in-Westmorland
from £500/pm
Best known for being a very durable and trustworthy vehicle, this 5 door combi Transit Custom 2L Limited gives you a diesel 2000cc motor and manual transmission, is finished in grey and has 24,333 miles on the clock. Available at the low price of £23,830 or you can also buy on finance together with evenly spread, affordable payments beginning at just £ per month.
350 Ecoblue Leader
3,181mi Manual Diesel 2.0L
£27,000
Redruth
from £567/pm
The Ford Transit Custom is in the top 20 of the UK's reliability index and at this dealership you can pick up this second hand model that’s got manual transmission with a 2.0l diesel engine and 3,181 miles on the dash.
2.0 280 Ecoblue Limited Panel Van Manua
96,749mi Manual Diesel 2.0L
£13,250
Staines-upon-Thames
from £278/pm
Currently available from this dealer is this reliable black Ford with a manual transmission and 2.0l diesel engine.
2L 350 Leader Cc Ecoblue
133,375mi Manual Diesel 2.0L
£8,770
Appleby-in-Westmorland
from £184/pm
For the total of only £8,770 is this Ford Transit Custom, it comes equipped with manual transmission and a 2.0 litre diesel engine. This second-hand model comes in white and has 133,375 miles clocked up on the dash.
Sport
2,040mi Auto Diesel 2.0L
£36,500
Bolton
from £766/pm
Located at this dealer in Bolton for the bargain price of only £36,500 is this almost flawless, like new with automatic transmission, a 2.0 ltr diesel engine and 2,040 miles clocked up on the dash.
Ford Transit Custom 280 L1 Die 2.0 Ecoblue 136Ps H
21,240mi Auto Diesel 2.0L
£21,999
Nuneaton
from £462/pm
First registered in 2025: Second hand Transit Custom Ford Transit Custom 280 L1 Die 2.0 Ecoblue 136Ps H with a 2000cc diesel engine, automatic transmission and only 21,240 miles on the dash.
Sport
5,285mi Auto Diesel 2.0L
£36,000
Bolton
from £756/pm
A superb price of only £36,000 is currently being advertised by this dealer in Bolton for this Transit Custom Sport that is rated as one of the most trustworthy and reliable vehicles available. This model is fitted out with a 2.0 L diesel engine and has 5,285 miles clocked-up on the dash.
2.2 Tdci 460 Hdt L4 H3 18 Seats
93,280mi Manual Diesel 2.2L
£10,995
Newbury
from £231/pm
The Reliability Index figure combines : cost, inconvenience caused and a car's failure rate. It's based on data gathered through millions of pounds of insurance claims that are made by drivers throughout each year and therefore gives motorists a comprehensive overview of cars on the UK's roads today. The Ford Transit Custom is amongst those ranked in the top 20 for reliability and at this dealer you can get this used 2.2 Tdci 460 Hdt L4 H3 18 Seats for just £10,995. It's a really good deal for this model, even more so when you take into account that it's less likely to leave you with an extra bill for repairs.
2.0 350 Ecoblue Trend Panel Van
23,602mi Manual Diesel 2.0L
£25,195
Staines-upon-Thames
from £529/pm
Having to get your car repaired is not only a pain, but it can even get expensive, you might want to consider buying one that's rated for being dependable. The Ford Transit Custom is among the top rated for reliability and this dealer currently has this used 2.0 350 Ecoblue Trend Panel Van for sale at only £25,195. It's fantastic deal for this model, particularly if you factor in those possible savings in repair bills.
2.0 300 Ecoblue Limited L2 H1 Euro 6 Ss
27,736mi Manual Diesel 2.0L
£17,290
Exeter
from £363/pm
This Transit Custom 2.0 300 Ecoblue Limited L2 H1 Euro 6 Ss features a 2000 CC diesel engine with manual transmission and has got 27,736 miles clocked-up on the dashboard.
2.0 130Ps G-sport Ecoblue Limited Panel Van Lwb L2
55,000mi Manual Diesel 2.0L
£22,990
Tadworth
from £483/pm
With 55,000 miles clocked-up on the dash and in the tone of black, this mpv Ford Transit Custom 2.0 130Ps G-sport Ecoblue Limited Panel Van Lwb L2 incorporates a 2.0 L diesel engine and manual transmission.
2.0 320 Ecoblue Sport Crew Van Awd L1 H1 Euro
500mi Auto Diesel 2.0L
£37,990
Cwmbran
from £797/pm
Take a closer look at this Ford Transit Custom 2.0 320 Ecoblue Sport Crew Van Awd L1 H1 Euro containing a 2000cc diesel engine with automatic transmission. This second hand model now in stock at our dealership in Cwmbran is up for sale at the incredible price of just £37,990.
2.0 350 Ecoblue Panel Van Fwd L2
47,142mi Manual Diesel 2.0L
£11,995
Staines-upon-Thames
from £252/pm
Renowned for its trustworthiness and reliability, this vehicle incorporates a 2000CC diesel motor and has manual transmission.
Trend
10mi Auto Hybrid 2.5L
£27,700
Gloucester
from £581/pm
Own this Transit Custom Trend for only £27,700. It has 10 miles clocked up on the dash and has a 2500cc hybrid motor with automatic transmission.
2.0 350 Ecoblue Panel Van Fwd L2
48,932mi Manual Diesel 2.0L
£11,995
Staines-upon-Thames
from £252/pm
Take a good look at this Transit Custom 2.0 350 Ecoblue Panel Van Fwd L2 that's ranked among 2017's top twenty, most dependable and trustworthy vehicles. This used model painted in the tone of white, has a 2000CC diesel motor with manual transmission and has 48,932 miles on the clock.
350 Ecoblue Mhev Leader
16,346mi Manual Diesel 2.0L
£17,995
Stoke-on-Trent
from £378/pm
Now on display at this retailer's showroom located in the Stoke-on-Trent area is this low mileage Transit Custom 350 Ecoblue Mhev Leader. It has just 16,346 miles clocked up on the dash and features a 2000 cc diesel motor with manual transmission.
2.0 130Ps G-sport Ecoblue Limited Panel Van Swb L1
37,000mi Manual Diesel 2.0L
£21,990
Tadworth
from £462/pm
This Transit Custom has 37,000 miles clocked up on the dash and is fitted with a 2.0 L diesel motor. It's now on the market and ready for its new owner to take home for the total cost of only £21,990.