2021 Ford Transit Custom
2L Leader
41,928mi Manual Diesel 2.0L
£13,450
Huddersfield
from £282/pm
Ford Transit Custom with a 2000cc diesel motor and manual transmission.
Images of a similar car, for illustrative purposes only.
350 2.0 Ebl 170 Bhp L3 Long Leader
20,000mi Auto Diesel 2.0L Not for sale on carsnitch
Current value range
8,007 cars
Rates from 9.9% APR. A Representative HP Example: borrowing £10,000 over 60 Months with a representative of 16.35% APR, an annual interest rate of 16.35% (fixed) and a deposit of £0.00, the amount payable would be 59 repayments of £239.16 per month, with one final repayment of £249.16 (which includes the option to purchase fee of £10.00), with a total cost of credit of £4,349.41 and a total amount payable of £14,359.41.
2L Leader
41,928mi Manual Diesel 2.0L
£13,450
Huddersfield
from £282/pm
Ford Transit Custom with a 2000cc diesel motor and manual transmission.
Rates from 9.9% APR. A Representative HP Example: borrowing £10,000 over 60 Months with a representative of 16.35% APR, an annual interest rate of 16.35% (fixed) and a deposit of £0.00, the amount payable would be 59 repayments of £239.16 per month, with one final repayment of £249.16 (which includes the option to purchase fee of £10.00), with a total cost of credit of £4,349.41 and a total amount payable of £14,359.41.
320 Ecoblue Leader 130Ps L2 Lwb With Ply Lined, De
40,000mi Manual Diesel 2.0L
£12,990
Tredegar
from £273/pm
Up for sale and ready for its next owner to drive away today is this Ford Transit Custom 320 Ecoblue Leader 130Ps L2 Lwb With Ply Lined, De that incorporates a 2.0 ltr diesel engine and manual transmission. This second hand one with low mileage has only got 40,000 miles clocked-up on the dash.
2.0 350 Ecoblue Leader Dropside
47,739mi Manual Diesel 2.0L
£15,490
Exeter
from £325/pm
Now available for a test drive at your request is this motor with 47,739 mi clocked-up on the dash, manual gearbox and 2000 cc diesel engine.
320 Limited L1 Swb Fwd 2.0 Ecoblue 136Ps Low
28,789mi Auto Diesel 2.0L
£25,490
Carlisle
from £535/pm
Get behind the steering wheel of this Transit Custom 320 Limited L1 Swb Fwd 2.0 Ecoblue 136Ps Low for just £25,490. It has clocked up 28,789 miles and incorporates a 2.0 Litre diesel engine.
2.0 Transit Custom
52,083mi Manual Diesel 2.0L
£15,999
Chesterfield
from £336/pm
Now available upon your request is this used car with 52,083 miles clocked-up on the dashboard, manual gearbox and 2.0 LTR diesel motor.
2L Limited
23,165mi Manual Diesel 2.0L
£16,990
Appleby-in-Westmorland
from £357/pm
A 2000 cc diesel engine and manual transmission are just a couple of the aspects that this mpv used car is offering its new driver.
2026 2.5 340 Duratec 11.8Kwh Limited Kombi L2
8,971mi Auto Hybrid 2.5L
£37,490
Luton
from £787/pm
This Transit Custom has been created with trustworthiness and dependability in mind. This second hand model, from this dealer is fitted with a 2.5 litre hybrid engine with automatic transmission and has 8,971 miles clocked up on the dashboard.
2.2 Tdci 290 Limited L2 H1 6Dr
82,000mi Manual Diesel 2.2L
£14,995
St Austell
from £315/pm
Renowned for its trustworthiness, this Transit Custom 2.2 Tdci 290 Limited L2 H1 6Dr features manual transmission and it has a 2.2 ltr diesel engine. This dealership currently has this second hand model on offer that has 82,000 miles clocked up on the dashboard. It's available at the really amazing price tag of £14,995 or by making monthly repayments starting off at around £ per month.
350 Limited L3 H2 Lwb Medium Roof Fwd 2.0 Ecoblue
16,728mi Manual Diesel 2.0L
£26,995
Craigavon
from £567/pm
Located in Craigavon at the terrific price of just £26,995 is this Ford with low mileage. It is a great choice of mpv if you're on the lookout for a vehicle that has an excellent reputation for trustworthiness and reliability.
320 Limited L1 Swb Fwd 2.0 Ecoblue 136Ps Low
6,544mi Auto Diesel 2.0L
£26,490
Aberdeen
from £556/pm
Go for a test drive in this dependable Transit Custom 320 Limited L1 Swb Fwd 2.0 Ecoblue 136Ps Low that is listed as one of the UK's top 20 most reliable vehicles. This one currently for sale at our dealership in Aberdeen is a second hand vehicle, but it was well looked after by the previous owner and remains in an almost pristine, like new condition in and out.
460 Leader L4 H3 Elwb High Roof 17 Minibus 2.
12,506mi Auto Diesel 2.0L
£22,490
Carlisle
from £472/pm
This dealer is currently advertising a great price of just £22,490 for this near mint Ford Transit Custom 460 Leader L4 H3 Elwb High Roof 17 Minibus 2..
290 Ecoblue Trend Fwd
90,133mi Manual Diesel 2.0L
£9,995
Sunderland
from £210/pm
The Ford Transit Custom is in the top twenty of the UK's reliability index and this dealer in Sunderland currently has this used one for sale at just £9,995. That's a bargain price for this model, particularly taking into account that it is less likely to leave you with a repair bill.
Transit Custom 2.0 320 Ecoblue Titanium Nugget
450mi Auto Diesel 2.0L
£69,850
Christchurch
from £1,466/pm
This dealership located in Christchurch is currently advertising a mere £69,850 for this Transit Custom that is known as one of the most reliable and trustworthy models around. It is fitted with a 2.0 Ltr diesel engine and has 450 miles clocked-up on the dashboard.
350 Leader L2 Mwb Single Cab 1 Way Tipper Rwd 2.0
7,393mi Manual Diesel 2.0L
£31,990
Hayes
from £671/pm
On display at this car retailer's showroom is this Transit Custom 350 Leader L2 Mwb Single Cab 1 Way Tipper Rwd 2.0 which contains a 2.0 Litre diesel engine with manual transmission.
2.2 Tdci 350
107,280mi Manual Diesel 2.2L
£3,995
Bolton
from £84/pm
Purchase this second-hand Transit Custom for £3,995. Credit plans commence from £ a month for this motor that contains a 2.2 litre diesel motor with manual transmission.
2.0 320 Ecoblue Titanium Nugget L1
450mi Auto Diesel 2.0L
£69,850
Christchurch
from £1,466/pm
Now available at this dealership in Christchurch is this Transit Custom 2.0 320 Ecoblue Titanium Nugget L1 that comes with a diesel, 2.0 L engine and automatic transmission. It is up for sale in the shade of with 450 miles on the dashboard.
280 L1 Fwd 2.0 Ecoblue 136Ps H1 Limited
14,620mi Manual Diesel 2.0L
£23,500
Staines-upon-Thames
from £493/pm
Revered for its trustworthiness and reliability, this Transit Custom features manual transmission and a 2000 cc diesel engine. This second hand model has 14,620 mi on the dashboard and is currently available on the market in a white finish.
320 Limited L1 Swb Double Cab In Van 2.0 Ecob
3,938mi Auto Diesel 2.0L
£29,900
Glasgow
from £628/pm
At the price of £29,900 or with the possibility to purchase using finance with achievable repayments beginning from £ per month, this Ford Transit Custom 320 Limited L1 Swb Double Cab In Van 2.0 Ecob contains a 2.0l diesel motor with automatic transmission and has 3,938 miles clocked-up on the dashboard.
Transit 2.0Dm Custom 310 Sport Panel Van
52,906mi Manual Diesel 2.0L
£20,000
Chelmsford
from £420/pm
Be the next owner of this dependable Ford which has a top 20 ranking for its reliable design. It is fitted out with a 2000 cc diesel engine with manual transmission. This second hand model currently available at our dealership in Chelmsford has 52,906 miles on the dash and has been finished in the shade of .
2.0 Ecoblue 170Ps Aluminium Tipper 1 Way
36,009mi Manual Diesel 2.0L
£27,000
Chelmsford
from £567/pm
Now available at this dealer in the Chelmsford area is this vehicle incorporating a 2000cc diesel motor with manual transmission. It's available to drive away in a finish.
2.2 Tdci 310 Panel Van L2 H2 18
95,525mi Manual Diesel 2.2L
£9,995
Oldbury
from £210/pm
Commencing at around £ each month, you can get this Transit Custom with manual transmission, a diesel 2.2 L engine and 95,525 miles on the clock.
320 Limited L2 Lwb Double Cab In Van Fwd 2.0
11,773mi Auto Diesel 2.0L
£29,990
Epsom
from £630/pm
The Reliability Index analyses - the cost, the inconvenience for the driver and rate of failure. It is based on data that has been collected from the large number of insurance claims that are filed by motorists throughout each year, therefore showing motorists a good overview of cars on the road. Ford's Transit Custom is in the top 20 of the UK's Reliability Index and this dealership in Epsom currently has this second hand 320 Limited L2 Lwb Double Cab In Van Fwd 2.0 for sale at just £29,990. That is a bargain for this particular model, even more so if you factor in possible savings in repair bills.
2.0 280 Ecoblue Limited L1 H1 Euro 6 Ss
14,408mi Manual Diesel 2.0L
£23,000
Hinckley
from £483/pm
A great price of just £23,000 is being offered by us at this dealer for this trustworthy and dependable Ford Transit Custom 2.0 280 Ecoblue Limited L1 H1 Euro 6 Ss. It's a pre-owned, second hand vehicle however it's been well cared for and therefore remains in a splendid, nearly new condition.
320 Limited L1 Swb Fwd 2.0 Ecoblue 136Ps Low
9,399mi Auto Diesel 2.0L
£27,990
Epsom
from £588/pm
A marvellous price of just £27,990 on this Transit Custom 320 Limited L1 Swb Fwd 2.0 Ecoblue 136Ps Low that has got a 2000CC diesel motor with automatic transmission. It is a pre-owned, second hand model, however it has been well cared for and remains in an almost spotless, near mint condition in and out.